Roofing Projects

AC Hotel South San Francisco

Flaherty Brothers Construction Installed a Fully-Adhered R-30 Tapered Insulation System with a ¼” Dens-Deck cover board & 60 Mil TPO Single-Ply System. In addition to the roof system, Flaherty Brothers Construction installed 8,000’ Sq/Ft of an acoustical ceiling system throughout the First floor lobby & Second floor meeting rooms.

The Foundry

Flaherty Brothers Construction Installed a Mechanically attached ¼” Dens-Deck cover board & 60 Mil TPO Single-Ply System as well as a 4-Ply Title 24 compliant Built Up Roof System.

San Jose Student Housing

Flaherty Brothers Construction Installed a Mechanically attached ¼” Dens-Deck cover board & 60 Mil TPO Single-Ply System & a Garland Standing Seam Metal roof system at all sloped roofs.

Wyndham Hotel

Flaherty Brothers Construction Installed a Mechanically attached 1/4” Dens-Deck cover board & 60 Mil TPO

Mathilda Apartments

Flaherty Brothers Construction installed 40,000" Sq/Ft of 60 Mil TPO Over 2" Rigid Insulation & 3/4" Dens-Deck. 37,000 Sq/Ft of GAF Composition Shingles & (28) Standing Seam Metal Awnings.

Broadway Oakland

Flaherty Brothers Construction installed 120,000" Sq/Ft of 60 Mil TPO Over 1" Rigid Insulation. 60 Mil TPO Self-Adhered Membrane @ All Walls.

San Carlos Transit Center

Flaherty Brothers Construction Installed 200,000" Sq/Ft of 60 Mil TPO Single-Ply over 1/4" Dens-Deck & 12,000" Sq/Ft of Standing Seam Metal roof systems.

Marshall Squares

Flaherty Brothers Construction Installed 55,000" Sq/Ft of 60 Mil TPO Single-Ply over 1/4" Dens-Deck.

AC Hotel San Jose

Flaherty Brothers Construction Installed a 35,000" square foot Fully-Adhered R-30 Tapered Insulation System with a ¼” Dens-Deck cover board & 60 Mil TPO Single-Ply System.

NOVO Mountain View, CA

Under Construction

54,000" Sq/Ft of 60 Mil TPO Self-Adhered Membrane over 1" Rigid Insulation.

Great Oaks Apartments

Flaherty Brothers Construction Installed a Mechanically attached ¼” Dens-Deck fire rated cover board & 60 Mil GAF TPO Single-Ply System.

19th And Harrison Apartments

Flaherty Brothers Construction Installed a Mechanically attached R-30 tapered insulation system with ¼” Dens-Deck fire rated cover board & 60 Mil Fibertite KEE Single-Ply System.

Renaissance Apartments

Flaherty Brothers Construction Installed 35,000" Sq/Ft of 1" fire rated cover board and 60 Mil Firestone TPO & 38,000" Sq/Ft of concrete Eagle S-Tile

W-12

Flaherty Brothers Construction Installed a Mechanically attach R-30 tapered insulation system, ¼” Dens-Deck fire rated cover board & Mechanically attach Firestone 60 Mil TPO System.

200 Linden

Flaherty Brothers Construction Installed a Fully Adhered System with Vapor Barrier,  ½” Dens-Deck Prime, R-38 Tapered Insulation System and Fully adhered 60 Mil TPO system.

San Pedro Squares

Flaherty Brothers Construction Installed a Mechanically attach R-30 tapered insulation system, ¼” Dens-Deck fire rated cover board & Mechanically attach Firestone 60 Mil TPO System.

Ameswell Hotel

Flaherty Brothers Construction Installed a Fully adhered system with a R-48 tapered insulation system, ½” primed coverboard, and Fibertite 60 Mil Fleece-back KEE.

975 Bryant

Flaherty Brothers Construction Installed a Fully adhered system with a R-30 tapered insulation system, ½” primed coverboard, and Fibertite 60 Mil Fleece-back KEE.

Broadway Valdez

Flaherty Brothers Construction Installed a Mechanically attach R-30 tapered insulation system, ¼” Dens-Deck fire rated cover board & Mechanically attach Firestone 60 Mil TPO System.

Sherwin Williams

Under Construction

Flaherty Brothers Construction Installed a Mechanically Attached System with a 2” rigid insulation board & 60 Mil TPO Single-Ply System.

1031 Walnut

Flaherty Brothers Construction installed 270,000 Sq./Ft. on 2 Buildings of R-30 Tapered Insulation System with Mechanically Attached 60 Mil TPO.

3515 Walnut

Flaherty Brothers Construction Installed 70,000 Sq./Ft. of ¼” Dens Deck with Fully adhered 60 Mil TPO

Antioch Senior Housing

Flaherty Brothers installed 124,000' Sq/Ft of CertainTeed Cool Roof Shingles & 54,000' Sq/Ft of mechanically attached 1/4" Dens-Deck & 60 mil GAF TPO on (12) Buildings.

Anton Noma

Flaherty Brothers Construction installed 24,000 Sq./Ft. of a Vapor Barrier, R-30 Tapered Insulation System, 1/2" Primed Dens-Deck cover board and Fully Adhered 60 Mil TPO.
 
 

777 Middlefield Rd

Under Construction